Central Weber Sewer Improvement District
Wastewater Treatment Plant Expansion
|
In 2007 SKM joined with MWH and performed instrumentation and controls engineering for a new activated sludge plant that was constructed adjacent to the existing plant. SKM provided construction management services for the project and is also acting as systems integrator. SKM will provide 19 PLC panels and network cabinets. As the systems integrator, SKM programmed the PLCs and the HMIs throughout the plant and seamlessly integrated the new plant with the existing plant. Along with the process control SKM was also contracted to do the HVAC controls for the new plant expansion. The project included 14 air handling units in eight buildings. Allen-Bradley ControlLogix were used in each building. Several buildings utilized AB Flex remote IO drops for air handling units. Operators were able to use Allen-Bradley OITs at each building to completely control the HVAC system. The HVAC system was also put on their overall SCADA system using the GE iFix platform.
|
Project Details:
Client |
Central Weber Sewer Improvement District |
Reference |
*Available upon request |
Location |
Ogden, UT |
Dates |
2007 - 2012 |
Value |
$2.1 million |
Features |
■ SCADA System Network Design ■ Instrumentation & Controls Design ■ System Integration ■ Construction & Installation ■ Startup & Commissioning ■ Construction Management |