SKM Engineering
  • Home
  • Solutions
  • Company
  • Team
  • Experience
  • Careers
  • Contact
  • Home
  • Solutions
  • Company
  • Team
  • Experience
  • Careers
  • Contact
Search

Ogden City Water Treatment Plant

In 2014 Ogden City began the construction of a new membrane water treatment plant, replacing their antiquated gravity filter process. SKM upgraded their existing Allen-Bradley PLC5 and SLC500 with DH+ control system to a ControlLogix platform with Ethernet/IP. We also connected to four sites down Ogden Canyon utilizing fiber optic cabling. The existing and antiquated Wonderware InTouch system was replaced with a new HMI system utilizing Inductive Automation’s Ignition. We worked closely with the membrane manufacturer so that the final system would work seamlessly. We also upgraded their PLC hardware at their 25 remote water production and distribution sites and tied them into the new HMI software. In addition, we assisted the City in the implementation of a new water meter reading system. Since that time SKM has provided on-call support for the water system.
contact us

Picture
Picture
Picture
Picture

Project Details:

Client
Ogden City Water
Reference
*Available upon request
Location
Ogden City, UT
Dates
2014 (Current Service Contract)
Value
*Available upon request
Features
■ Facility Maintenance & On-Call Support
■ HMI Programming
■ Network Design & Implementation
■ System Integration
■ Process Diagrams
■ PLC Programming

SKM Engineering

533 W 2600 S Suite 25
Bountiful, UT 84010
(801) 677-0011

Links

Solutions
Company
Team
Experience
Careers
​Contact

Policies

    Newsletter

Sign Up

© 2021 SKM Engineering. All Rights Reserved.
  • Home
  • Solutions
  • Company
  • Team
  • Experience
  • Careers
  • Contact