SKM Engineering
  • Home
  • Solutions
  • Company
  • Team
  • Experience
  • Careers
  • Contact
  • Home
  • Solutions
  • Company
  • Team
  • Experience
  • Careers
  • Contact
Search

San Felipe

Wastewater Treatment Plant SCADA Upgrade
The San Felipe Wastewater Treatment Plant was a 0.3 MGD Kubota/Enviroquip flat plate membrane bioreactor (MBR) facility.  

SKM performed the electrical, instrumentation and controls design engineering and provided electrical, instrumentation and controls construction management. In addition, SKM provided the system integration and programming services for the entire plant.  Allen Bradley SLC 500 PLCs were used as the PLC platform.
Picture
contact us

Picture
Picture

Project Details:

Client
Pueblo of San Felipe
Reference
*Available upon request
Location
San Felipe, NM
Dates
2021
Value
*Available upon request
Features
■  Startup and Commissioning
■  Controls Construction Management
■  Allen Bradley SLC 500 PLCs
■  Implementation
■  Programming Services
■  Integration
■  Installation
■  Consultant

SKM Engineering

533 W 2600 S Suite 25
Bountiful, UT 84010
(801) 677-0011

Other Office Locations

California
Idaho
Colorado

Links

Solutions
Company
Team
Experience
Careers
​Contact

Policies

    Newsletter

Sign Up
© 2026 SKM Engineering. All Rights Reserved.
  • Home
  • Solutions
  • Company
  • Team
  • Experience
  • Careers
  • Contact