SKM Engineering
  • Home
  • Solutions
  • Company
  • Team
  • Experience
  • Careers
  • Contact
  • Home
  • Solutions
  • Company
  • Team
  • Experience
  • Careers
  • Contact
Search

San Felipe Wastewater Treatment Plant

The San Felipe Wastewater Treatment Plant was a 0.3 MGD Kubota/Enviroquip flat plate membrane bioreactor (MBR) facility.  

SKM performed the electrical, instrumentation and controls design engineering and provided electrical, instrumentation and controls construction management. In addition, SKM provided the system integration and programming services for the entire plant.  Allen Bradley SLC 500 PLCs were used as the PLC platform.
contact us

Picture
Picture

Project Details:

Client
Pueblo of San Felipe
Reference
*Available upon request
Location
San Felipe, NM
Dates
2021
Value
$100 K
Features
■ Electrical
■ Design Engineering
■ Controls Construction Management
■ Allen Bradley SLC 500 PLCs
■ System Integration
■ Electrical Instrumentation
Download Project Profile

SKM Engineering

533 W 2600 S Suite 25
Bountiful, UT 84010
(801) 677-0011

Links

Solutions
Company
Team
Experience
Careers
​Contact

Policies

    Newsletter

Sign Up

© 2021 SKM Engineering. All Rights Reserved.
  • Home
  • Solutions
  • Company
  • Team
  • Experience
  • Careers
  • Contact