Water Reclamation Facility 14 MGD Plant Expansion

Picture
SKM provided electrical, controls and instrumentation design for the second phase of an expansion project bringing the facility from 8 to 14 MGD. The plant will be upgraded and expanded to meet future needs and improve treatment. Improvements include headworks, primary clarification, flow equalization, bio-reactor expansion, secondary clarification, tertiary filtration, chlorination, WAS thickening, conversion to anaerobic digestion, solar drying, and odor control. SKM’s design efforts included rerouting the utility feed to the facility, modifications and additions to the existing power distribution, network and controls upgrades and efforts to enclose existing outdoor MCC’s and control cabinets.
contact us

Picture

Project Details:

Client
Western Riverside County Regional Wastewater Authority (WRCRWA)
Reference
*Available upon request
Location
Eastvale, CA
Dates
2019
Value
*Available upon request
Features
■ Master & Capital Spending Plan
■ Construction & Installation
■ System Integration
■ Hardware/Software Selection
■ SCADA System Network Design
■ Startup & Commissioning
Download Project Profile

SKM Engineering

533 W 2600 S Suite 25
Bountiful, UT 84010
(801) 677-0011

Links

Solutions
Company
Team
Experience
Careers
​Contact

Policies

    Newsletter

Sign Up

© 2021 SKM Engineering. All Rights Reserved.
  • Home
  • Solutions
  • Company
  • Team
  • Experience
  • Careers
  • Contact