Water Reclamation Facility 14 MGD Plant Expansion
|
SKM provided electrical, controls and instrumentation design for the second phase of an expansion project bringing the facility from 8 to 14 MGD. The plant will be upgraded and expanded to meet future needs and improve treatment. Improvements include headworks, primary clarification, flow equalization, bio-reactor expansion, secondary clarification, tertiary filtration, chlorination, WAS thickening, conversion to anaerobic digestion, solar drying, and odor control. SKM’s design efforts included rerouting the utility feed to the facility, modifications and additions to the existing power distribution, network and controls upgrades and efforts to enclose existing outdoor MCC’s and control cabinets.
|
Project Details:
Client |
Western Riverside County Regional Wastewater Authority (WRCRWA) |
Reference |
*Available upon request |
Location |
Eastvale, CA |
Dates |
2019 |
Value |
*Available upon request |
Features |
■ Master & Capital Spending Plan ■ Construction & Installation ■ System Integration ■ Hardware/Software Selection ■ SCADA System Network Design ■ Startup & Commissioning |